Beacon Hill Architectural Commission
The Beacon Hill Architectural Commission will hold its monthly public hearing on Thursday April 16, 2020, at 5 p.m.
ATTENTION: This hearing will only be held virtually and NOT in person. You can participate in this hearing by going to https://zoom.us/j/289955040 or calling 1-929-205-6099 and entering id 289 955 040#. You can also submit written comments or questions to BeaconHillAC@boston.gov or via Twitter @bostonlandmarks.
Discussion Topics
-
VIOLATIONS
APP # 20.704 BH 5 West Cedar Street Proposed Work: Ratification of unapproved “private way” signage.
VIO # 20.014 BH 4 Pinckney Street Proposed Work: Ratification of unapproved work at the rear of the property and an unapproved shoe scraper.
APP # 20.927 BH 54 Pinckney Street Proposed Work: Ratification of unapproved work at front façade including crack repair in lintel, cracked sills, step crack. Replace exterior lantern, doorbell. Paint front Door.
-
DESIGN REVIEW
APP # 20.740 BH 35 Beacon Street: Proposed Work: At front façade level four, remove six existing storm windows and replace with new ProVia storms. Fabricate and install wood sills to replace the existing deteriorated sills in kind.
APP # 20.860 BH 10 Charles River Square Proposed Work: Repaint front door. At rear façade level 1 through 5, replace five (total), wood, 6 over 6 windows with five, aluminum clad, 6 over 6 windows. (See additional items in administrative review).
APP # 20.789 BH 52 Beacon Street (Continued from 2/2020) Proposed Work: Install sliding glass access hatch with copper clad end walls.
APP # 20.868 BH 20 Beacon Street Proposed Work: Install small vent for new boiler at front façade.
APP # 20.783 BH 73 Mount Vernon Street Proposed Work: At front yard, install seasonal planter, add stone garden bench, granite pavers, pea stone path.
APP # 20.793 BH* 30 Brimmer StreetProposed Work: At all facades, level one and two, replace 14, wood, 4 over 4, double hung windows.Removed by StaffAPP # 20.833 BH 17A Branch Street Proposed Work: Install light fixture to the right of the main door.
APP # 20.863 BH 99 Pinckney Street Proposed Work: Remove and replace roof deck in the same dimensions with a new code compliant handrail (See Additional Items in Administrative Review).
APP # 20.881 BH 104 Mount Vernon Street Proposed Work: Rebuild front brick wall, restore to include a granite foundation veneer that existed historically, install new handrail. Recast stone sills at side façade
APP # 20.965 BH 10.5 Beacon Street Proposed Work: Extensive façade restoration at north (Beacon Street) façade and terrace.
APP # 20.967 BH 10.5 Beacon Street Proposed Work: Small alterations to front bronze doors and interior leather doors.
-
Advisory Review
2 Beaver Place Proposed Work: Add window in well which is currently bricked up, add access door at side façade.
-
ADMINSTRATIVE REVIEW
APP # 20.880 BH* 48 Beacon Street: At right side façade, repoint masonry above windows and door, install flashing above windows and door, remove brick bulge on 11th floor, scrape and repaint windows. Replace deteriorated wood in kind.
APP # 20.831 BH 77 Charles Street: At front façade, restore brownstone brackets at gutter line, rebuild brickwork at fire escape braces, cut and point brick masonry joints.
APP # 20.825 BH* 137 Charles Street: At front façade, repair brick façade in kind.
APP # 20.860 BH 10 Charles River Square: At front façade levels one, two, and three, replace five, wood, 6 over 6 windows with five, wood, 6 over 6 windows (See Additional Items in Design Review).
APP # 20.881 BH 50 Chestnut Street: At dormer level, front façade, replace two, 6 over 6, simulated divided lite, wood windows and at rear façade dormer level, replace four, simulated, 6 over 6, wood windows with six, 6 over 6, wood, true divided light windows.
APP # 20.851 BH 68 Chestnut Street: Repair and repoint right side and chimney of 68 Chestnut Street with mortar type N.
APP # 20.872 BH 11 Hancock Street: At front façade, spot repoint brick and repair in kind. Replace deteriorated trim in kind. Replace gutter in kind.
APP # 20.920 BH 129 Mount Vernon Street: Repoint right façade with mortar 6-7 Parts Sand, 1-2 Parts Portland, 1-2 Parts Lime.
APP # 20.863 BH 99 Pinckney Street: Remove and replace front and rear slate roof and dormer cheek wall in kind. Replace copper flashing in kind, cut and repoint left and right side rising wall, and rear façade using mortar type N. Repaint front shutters and window sash and trim in kind with BM Aura, Grand Entrance Black (See Additional Items in Design review).
APP # 20.899 BH 112 Pinckney Street: At front façade level 1, replace three, wood 6 over 1, windows with three, 6 over 1, wood, true divided light windows
APP # 20.864 BH 3 Spruce Street: Repoint front and side facades using mortar type N. Repair deteriorated wood to match existing.
APP # 20.881 BH 9 Temple Street At front façade, level two replace three 6 over 6 wood replacement windows and storm windows, with three,, 6 over 6 wood windows, no storm windows.
- RATIFICATION OF 2/20/2020 PUBLIC HEARING MINUTES & 1/15/2020 PUBLIC SUBCOMMITTEE MEETING MINUTES
- STAFF UPDATES